Skip to content

Replace the legacy system without stopping the business.

Modernization module by module: an interface in front of the old application, one part replaced at a time, and a tested way back at every step. No big-bang cutover.

Does this sound familiar?

It still works. Nobody wants to be the one who changes it.

  • One application runs orders, stock or billing, and everything else depends on it.
  • One person understands it, and every change waits for them.
  • The runtime or the database is out of support, and so is the server under it.
  • A small change takes weeks, and it cannot be connected to anything new.

What you get

Six deliverables, one module at a time.

  1. A system assessment. The code, the data, the jobs and the systems that depend on it, with the risks of each part ranked.
  2. A target architecture and a phase plan. Which modules move in which order, and why: risk and value first, not the order of the menu.
  3. An interface layer in front of the old system. Users and other systems talk to the layer, so a module can move behind it without anyone noticing. This is the strangler fig pattern.
  4. Modules replaced, each with its data. Each module with its data migration and a reconciliation report against the old system.
  5. A rollback rehearsal record for every cutover. The way back, run before the switch and written down with its result.
  6. A decommission checklist. What has to be true before the old system is switched off, and the archive of its data.

The artifact

A cutover plan, with the way back written first.

An excerpt of the plan for one module: invoicing, moved out of an old order system. Each step has a check and a condition that sends it back.

StepWhat happensCheck before moving onRoll back if
1. FreezeInvoice changes stop in the old system at an agreed timeOpen invoices counted and saved–
2. MigrateOpen and recent invoices copied to the new moduleReconciliation report: counts and totals equalAny total differs
3. SwitchThe interface layer sends invoicing to the new moduleTen agreed invoices created and checkedAny of the ten is wrong
4. WatchBoth systems kept; the old one read-onlyDaily comparison for two weeksA difference nobody can explain
5. CloseThe old invoicing screens are removedSign-off by the finance owner–
Illustrative · The rollback was rehearsed in a test environment the week before, and the record is part of the plan.

How it is accepted

Same results as before, and a way back that has been tried.

An example of the acceptance table in the phase scope. The cases are chosen with the people who use the old system, including the odd ones.

CriterionMeasured onExample thresholdIf it is not met
Same results as the old moduleAgreed cases, run on bothEqual on every case, or the difference explainedFixed before cutover
Data migrated completelyThe reconciliation reportCounts and totals equalMigration corrected and re-run
Rollback rehearsedA test cutover and its reversalPassed and recordedCutover postponed
Nothing else brokeThe systems that call the old moduleTheir agreed checks passRolled back
Example values

Why not a rewrite

One cutover date is one large risk.

A full rewrite delivered on one date asks the business to trust years of hidden rules to a new system all at once. When something is missed, the only way back is the old system, which has often been frozen for months.

Module by module, each step is small enough to test against the old behavior and to reverse. The old system keeps running what has not moved yet, so the business never waits for the last module to benefit from the first.

Illustrative engagement

One module, moved and rehearsed.

An aging order system → invoicing moved first

The assessment shows that invoicing is the module with the most change requests and the clearest boundary. The first phase puts an interface layer in front of the order system, moves invoicing behind it with its open invoices, and keeps the old screens read-only for two weeks. The rollback is rehearsed in a test environment before the switch. The phase is accepted when the agreed invoices match on both systems and the rehearsal record is signed.

Example scope. Not a case study or a promised result.

Where the scope ends

What this service is not.

No rewrite is quoted without the assessment: until the code, the data and the dependencies are known, any price is a guess. Moving servers to the cloud without changing the application is the AWS migration service. We do not maintain the old system indefinitely: maintenance during the transition is scoped and ends with its decommission. Without the source code, the scope becomes replacement by observed behavior, which is slower and is stated as such in the proposal.

Questions

About legacy modernization.

How long does it take?

The assessment tells you, module by module. What you get from it is a plan in which every phase delivers something that works on its own, so the question becomes how long until the first module moves, not until everything has.

Can we keep adding features while you modernize?

Yes, behind the interface layer. New work goes into the new modules where it can; urgent changes to the old system are still possible and are listed in each phase, so nothing is lost when that module moves.

What if the person who knows the system leaves?

Then the assessment matters even more. Rules are written down as they are found, and the cases used for acceptance become the documentation of what the old system did.

Which technology do you move to?

The one your team can maintain, chosen in the assessment. Usually a widely used language and PostgreSQL, hosted in your cloud and described as code.

Keep going

Cloud & security

AWS architecture & migration

When the servers must move too, in waves with a rehearsed way back.

View service

Start from the problem

An aging application

The situation, a sensible first phase and what not to do first.

Read more

Cloud & security

DevOps & CI/CD

Releases you can repeat and roll back, for the new modules from day one.

View service

Next step

Bring the system everyone depends on.

In 30 minutes we can tell you what an assessment would look at, which module might move first and what the way back would be.