Skip to content

When the business depends on an application nobody wants to touch.

It still works. Changing it takes weeks, one person understands it, and the server under it is older than the support contract.

The problem

“Can we replace it without stopping the business?”

The application was built for the company as it was a decade or more ago. It runs orders, invoicing or scheduling, and other systems read from it. Every change request waits for the one person who knows the code, and every upgrade is postponed because nobody can say what would break. A full replacement looks like the only way out, and it looks too risky to start. So nothing happens, and the risk grows quietly.

  • Small changes take weeks, and each release is followed by a few anxious days.
  • One person understands the code, and the documentation is what they remember.
  • The operating system or the database under it is out of vendor support.
  • Other systems depend on it through file drops and database reads nobody has listed.
  • New needs are met with spreadsheets around it, because changing it is too slow.

A sensible first phase

Map it, put a layer in front, move one module.

The first goal is not a new system. It is to make the next change safe, and to show that one module can move without anyone noticing.

  1. 01

    Assess

    The modules, their data and every system that calls them, mapped with the people who use them. The assessment says which module moves first, and why.

    You holdA system map and an order of modules

  2. 02

    Put a layer in front

    Callers are pointed at a layer in front of the old application, one by one. From then on, what sits behind it can change without them knowing: the strangler fig pattern.

    You holdEvery caller going through one layer

  3. 03

    Move one module

    The module with the clearest boundary and the most change requests is rebuilt with its data, and checked against the old one on agreed cases.

    You holdOne module replaced, with a reconciliation report

  4. 04

    Rehearse the way back

    Before the switch, the rollback is run in a test environment and written down. The old module stays read-only for an agreed period.

    You holdA rehearsal record and a cutover date

Example scope. Not a case study or a promised result. · Servers move only where they must: one out of support is often moved as it is first, and retired with the last module.

What not to do first

The rewrite with one go-live date.

  • A full rewrite with one cutover date. It looks clean on a slide. In practice the old system is frozen while the new one is built, the business waits, and every rule nobody wrote down is found on go-live day.
  • New servers, and call it modernized. Moving the same application to newer infrastructure can buy time, and sometimes it should come first. It does not make the next change any easier.

Check before you talk to us

How a module moves, on paper first.

The plan for one module’s cutover, the pattern behind it, and the roadmap it belongs to.

Artifact

A cutover plan

One module’s cutover, step by step: what happens, the check before moving on, and the condition that sends it back.

See the plan

Glossary

Strangler fig pattern

Replacing a system piece by piece behind a layer, so the old and the new run side by side until the end.

Read the term

Sample deliverable

A phased roadmap

The roadmap page of the sample assessment report: each phase with what it delivers and how firm its quote is.

See the page

The services behind it

Where the work is done.

Custom software

Legacy modernization

Module by module behind an interface, each cutover with a way back that has been tried.

View service

Cloud & security

AWS architecture & migration

When the server under the application has to move before the application can.

View service

Cloud & security

DevOps & CI/CD

Automated builds and releases, so that a change to the old system stops being an event.

View service

Next step

Bring the application and the name of the person who knows it.

In 30 minutes we can tell you which module we would look at first, what the assessment would map and how a cutover would be made reversible.