Move to AWS in phases, each with a way back.

Architecture and migration for workloads that cannot stop: non-critical systems first, a rehearsal before every cutover, and a cost and performance review after each step.

Is this the right service?

A hosting deadline needs a migration plan.

  • Servers are reaching the end of support, but their applications still handle daily work.
  • A hosting contract is about to renew, and you need evidence before choosing where to run next.
  • Your AWS account grew through individual changes, without a documented network or recovery design.
  • A migration stalled because nobody could agree which dependency moves first or when to turn back.

What you receive

The architecture, the runbooks and the test records.

  1. An inventory and dependency map. Applications, databases, scheduled jobs, external connections and owners, with unknown dependencies recorded for investigation before a cutover date is agreed.
  2. A target architecture. Accounts, network boundaries, identity, data storage and backups, with availability and recovery targets tied to the application’s actual needs. Design choices include their operating cost and tradeoffs.
  3. Infrastructure as code. Reviewed definitions in your repository, with instructions for creating environments and recording approved changes. You can see how the target was built and reproduce it.
  4. A runbook for each wave. Preconditions, migration steps, application checks, decision points, rollback criteria and named responsibilities. Database writes and background jobs have explicit stop and restart instructions.
  5. A rehearsal record. What was tested, what failed, how long the steps took and what changed afterward. Unresolved issues remain visible before anyone approves production work.
  6. A review after cutover. Cost and performance compared with the agreed baseline, backup restore evidence, architecture notes and operating instructions handed over with each completed wave.

Migration artifact

A wave plan with a decision at every cutover.

Illustrative sequence for an application and its database. Rehearsal dates are agreed during planning; they are prerequisites for production scheduling.

WaveSystemsRehearsal dateRollback criteria
1 · Non-criticalTest application and a restored database copyAgreed date before wave 1Restore or application checks fail: rebuild the target before proceeding
2 · ApplicationApplication service, connections and scheduled jobsAgreed date before wave 2Agreed error or response thresholds fail: route traffic back and stop new jobs
3 · DataProduction database and dependent writersAgreed date before wave 3Reconciliation fails before writes reopen: keep the original database authoritative
Illustrative migration wave plan · The real plan states thresholds, dates, decision owners and the point after which reversing writes needs a separate recovery procedure.

Before moving data

Recovery is part of the architecture.

High availability and database design belong in the same dependency map. We agree which failures the workload must tolerate, how much data loss is acceptable and how quickly service needs to return. Those requirements guide replication, backup retention and recovery tests. Adding redundant infrastructure without checking application behavior does not establish that recovery works.

A backup record alone does not prove a usable restore. The rehearsal restores an agreed copy, starts the application and checks representative reads and writes. If the database engine or version changes, compatibility and data reconciliation are explicit tasks. Application modernization beyond the migration is a separate legacy modernization scope.

How it is accepted

Checks agreed before the wave starts.

CriterionEvidenceIf it fails
The application runs in AWSAgreed functional and performance checks with recorded resultsResolve the failed checks before accepting the wave
The rollback path worksRehearsal record, including the data authority decisionRework and rehearse before production cutover
Backups restoreRestored data and application verification recordKeep the wave open until recovery checks pass
Example acceptance criteria

Illustrative engagement

Start with one application and its dependencies.

A hosting renewal → a staged AWS move

The first phase maps an application, its database and its scheduled exports. A restored copy runs in a test environment before production scheduling begins. The runbook identifies who pauses writes, who checks reconciliation and who authorizes cutover. The phase includes one rehearsed wave and its handover; later workloads are estimated separately. A failed restore test keeps the production move off the calendar.

Example scope. Not a case study or a promised result.

Where the scope ends

Migration does not include continuous operations.

AWS bills your company directly; we are not a reseller. Availability and recovery targets are designed and tested, not guaranteed. Round-the-clock managed operations are outside this service. Other clouds require an explicit agreement. Rewriting application behavior, replacing a database engine or rebuilding every integration is included only when the written wave scope names that work.

Questions

About an AWS migration.

Can you promise no downtime?

No. We agree the allowed interruption and rehearse against it. Data volume, write patterns and dependencies determine the cutover method. If the rehearsal cannot meet the requirement, we revise the plan before scheduling production work.

Can the database move separately?

Sometimes. We check latency, connection paths, replication and write ownership first. Separating an application from its data can introduce failures, so the dependency map and rehearsal decide the sequence.

What happens after the first wave?

You receive its operating notes and test records. We review cost and performance before quoting the next wave. You can continue, pause or operate the migrated workload using the documentation in your repository.

Keep going

The controls around the migration.

Delivery

DevOps & CI/CD

Make the migrated application’s releases repeatable and reversible.

View service

Access

Cloud security review

Review the identities and configuration in the destination accounts.

View service

Cost

AWS cost review

Explain the bill and rank changes after the workload settles.

View service

Next step

Bring the workload list and the hosting deadline.

A 30-minute scope call can establish the first dependency to investigate and what a rehearsal needs to prove.