Delivery
DevOps & CI/CD
Make the migrated application’s releases repeatable and reversible.
View serviceArchitecture and migration for workloads that cannot stop: non-critical systems first, a rehearsal before every cutover, and a cost and performance review after each step.
Is this the right service?
What you receive
Migration artifact
Illustrative sequence for an application and its database. Rehearsal dates are agreed during planning; they are prerequisites for production scheduling.
| Wave | Systems | Rehearsal date | Rollback criteria |
|---|---|---|---|
| 1 · Non-critical | Test application and a restored database copy | Agreed date before wave 1 | Restore or application checks fail: rebuild the target before proceeding |
| 2 · Application | Application service, connections and scheduled jobs | Agreed date before wave 2 | Agreed error or response thresholds fail: route traffic back and stop new jobs |
| 3 · Data | Production database and dependent writers | Agreed date before wave 3 | Reconciliation fails before writes reopen: keep the original database authoritative |
Before moving data
High availability and database design belong in the same dependency map. We agree which failures the workload must tolerate, how much data loss is acceptable and how quickly service needs to return. Those requirements guide replication, backup retention and recovery tests. Adding redundant infrastructure without checking application behavior does not establish that recovery works.
A backup record alone does not prove a usable restore. The rehearsal restores an agreed copy, starts the application and checks representative reads and writes. If the database engine or version changes, compatibility and data reconciliation are explicit tasks. Application modernization beyond the migration is a separate legacy modernization scope.
How it is accepted
| Criterion | Evidence | If it fails |
|---|---|---|
| The application runs in AWS | Agreed functional and performance checks with recorded results | Resolve the failed checks before accepting the wave |
| The rollback path works | Rehearsal record, including the data authority decision | Rework and rehearse before production cutover |
| Backups restore | Restored data and application verification record | Keep the wave open until recovery checks pass |
Illustrative engagement
A hosting renewal → a staged AWS move
The first phase maps an application, its database and its scheduled exports. A restored copy runs in a test environment before production scheduling begins. The runbook identifies who pauses writes, who checks reconciliation and who authorizes cutover. The phase includes one rehearsed wave and its handover; later workloads are estimated separately. A failed restore test keeps the production move off the calendar.
Example scope. Not a case study or a promised result.
Where the scope ends
AWS bills your company directly; we are not a reseller. Availability and recovery targets are designed and tested, not guaranteed. Round-the-clock managed operations are outside this service. Other clouds require an explicit agreement. Rewriting application behavior, replacing a database engine or rebuilding every integration is included only when the written wave scope names that work.
Questions
No. We agree the allowed interruption and rehearse against it. Data volume, write patterns and dependencies determine the cutover method. If the rehearsal cannot meet the requirement, we revise the plan before scheduling production work.
Sometimes. We check latency, connection paths, replication and write ownership first. Separating an application from its data can introduce failures, so the dependency map and rehearsal decide the sequence.
You receive its operating notes and test records. We review cost and performance before quoting the next wave. You can continue, pause or operate the migrated workload using the documentation in your repository.
Keep going
Delivery
Make the migrated application’s releases repeatable and reversible.
View serviceAccess
Review the identities and configuration in the destination accounts.
View serviceCost
Explain the bill and rank changes after the workload settles.
View serviceNext step
A 30-minute scope call can establish the first dependency to investigate and what a rehearsal needs to prove.