Fixed price or time and materials?

Fixed price moves risk to the supplier only when the scope is written down. Otherwise it moves it to the change-request list.

Reviewed November 11, 2026

What each model fixes.

A fixed-price contract fixes the price and the scope. If the work takes longer, the supplier pays for it. If the scope turns out to be wrong, the buyer pays, through change requests.

Time and materials fixes the rate. The buyer pays for the hours worked and can change direction every week. If the work takes longer, the buyer pays for it.

Neither model removes uncertainty. Each decides who carries it and when it gets discussed: before the work, in the scope, or during the work, in the invoices.

A comparison.

QuestionFixed priceTime and materials
What is fixedScope, price and dateThe rate per day or per hour
Who pays if it takes longerThe supplierThe buyer
What a change costsA change request, quoted before work on it startsNothing extra: the next hours go to the new priority
What the buyer must provideA written scope, decisions on time, the agreed inputsSomeone who steers the work every week
Where it goes wrongA vague scope: every gap becomes a change request or a disputeNo end in sight: nobody is responsible for the total
What the supplier is paid forA resultEffort
FitsWork that can be described before it startsWork whose content is discovered by doing it

Three variants worth knowing.

Most real contracts sit somewhere between the two. Each variant moves a different part of the risk.

  • Fixed price per phase. The program is split into phases of a few weeks. Each has its own scope and price, and later ones stay estimates until they are next. The supplier carries the delivery risk of one phase at a time, and the buyer can stop between phases.
  • Time and materials with a cap. Hours are billed up to a ceiling. The buyer keeps the flexibility and limits the total. At the cap the supplier stops and asks.
  • A retainer. An agreed number of days each month for small changes and support, with a notice period. It is time and materials with a predictable invoice.

Why we price by phase.

Early estimates of a whole project are wide. Barry Boehm’s data, later popularized by Steve McConnell as the cone of uncertainty, put estimates made at the first concept at up to four times too high or too low. The range narrows only as requirements and design are settled.

A fixed price for a year of work, quoted on the first day, is therefore either padded for that range or wrong. A fixed price for eight weeks of work with a written scope is neither.

So we fix what can be known. Each phase is small enough to describe in a phase scope: its deliverables, its exclusions, its acceptance criteria, its date and its price. Later phases are estimates, and each is quoted firmly when it is next. What you receive at each step is on How we work.

Martin Fowler describes a neighboring answer: fix the price and the date, and let the scope flex inside them. It works when the buyer has someone to choose features week by week. Pricing by phase asks less of the buyer during the build and more before it.

What a phase scope must contain.

A fixed price is only as firm as the scope under it. Six parts, each with a test you can apply to any supplier’s proposal.

PartThe test
Numbered deliverablesCould a third party tell whether each one was delivered?
ExclusionsIs everything you assume is included written down, on one list or the other?
Acceptance criteriaCould you run them yourself, and would two people agree on the result?
AssumptionsDoes it say what happens to the price if one turns out to be false?
Your inputs, with datesIs it clear what a late answer or late access does to the timeline?
Change requestsAre they quoted in writing before any work on them starts?
If a proposal fails the first two tests, its fixed price moves no risk to the supplier.

When time and materials is the honest choice.

Some work cannot be described before it is done. Quoting it at a fixed price means guessing, and one side pays for the guess.

When you do use time and materials, three guardrails keep it from running away: a cap that needs your approval to pass, a written weekly summary of what the hours produced, and the right to stop at the end of any week. It is the honest choice for:

  • Discovery. Finding out what a system does, or why it fails. The output is knowledge, and it sizes the next phase.
  • An application nobody has opened. Until someone has read the code and the data, any price is a guess.
  • Small ongoing changes. A monthly allowance of hours is simpler than a quote for every change.
  • A product steered week by week. If your product owner reprioritizes constantly, paying for a team’s time is the accurate description.
  • An emergency. Nobody scopes a production incident first.

Questions to ask any supplier.

  • What exactly is excluded, and where is that written?
  • How is “done” decided for each deliverable, and by whom?
  • What does a change cost, and can work on it start before I approve the quote?
  • Which assumptions would change the price, and what happens then?
  • In whose name are the repository and the cloud accounts, and from which day?
  • If I stop after this phase, what do I hold, and can another team continue from it?
  • For time and materials: what is the cap, and what do I receive every week?

Sources.

  • Barry W. Boehm, Software Engineering Economics, Prentice Hall, 1981.
  • Steve McConnell, Software Estimation: Demystifying the Black Art, Microsoft Press, 2006. See also The Cone of Uncertainty, Construx.
  • Martin Fowler, Fixed Price, 2003.

Keep going

How this looks in our own contracts.

The approach

How we work

What you receive at every step, and the evidence each risk control leaves behind.

How we work

In writing

Our terms

The published terms: quotes, payment, change requests and ownership.

Read our terms

The first step

AI & software assessment

The first fixed-scope step: a written report, and a firm quote for phase 1.

What the assessment covers

Next step

Have a scope you are not sure is firm?

Bring it. In 30 minutes we can tell you which parts could be priced today, and which need a closer look first.